Engineering and financial audit of an 80 MW photovoltaic plant in Adra, connected to the 230 kV transmission network.
Power Engineering Consortium audited one of the largest renewable projects in Syria: an 80 MW photovoltaic plant on about 930 dunums in Adra, built to sell its output to the transmission utility at 230 kV.
The review covered 147,840 bifacial modules, TMEIC central inverters, outdoor combiner boxes at 1,500 V DC, and a GIS substation stepping up from 20 kV to 230 kV, together with losses, protection, grid-code compliance, capital and operating cost, and the power-purchase model.